Refurbishments

Whole-house refurbishments that respect the original fabric and modernise where it counts.

Detail

Strip-outs, replastering, rewires, replumbs, joinery, decoration. Phased to keep families in the house where possible, sequenced to keep dust contained.

FAQ

Refurbishments, answered.

The questions we get asked most. Anything else, just call the office.

  • Typically 16 to 28 weeks, depending on how much of the structure and services are being changed. That is once the drawings are settled and any approvals are in place.

  • Usually not for internal work. Planning generally applies to what you change outside or how you extend the footprint. Building regulations are different though: removing or altering a structural wall, rewiring, or moving drainage all need building control sign-off, which we arrange.

  • Not always. Where it is practical we sequence the build so you can stay in part of the house, and we tell you honestly at the quoting stage if a phase makes that unrealistic rather than finding out halfway through.